When APSEB came into existence in 1959, APSEB started functioning with the objectives of maintaining the power sector efficiently and economically simultaneously ensuring demand meets the supply.During the last decade inadequate capacity addition and low system frequency operation of less than 48.5 Hz for more than half a decade considerably reduced the power supply reliability.The imbalance of the revenues against the cost of production, no significant reduction in technical losses and energy thefts, high cost purchases from IPP’s, other SEB’s gradually worsened the financial position of APSEB
Results Tr. Sub-Engineer(for Engineering Diploma holders in Electrical, Mechanical, Electronics & Civil)
Click here results for Sub-Engineer 2011
Source..
APGENCO Sub Engineer Results 2011 Available
Subscribe to:
Post Comments (Atom)
Comments :
Post a Comment